The structure of the Event 2008

0
413

Friday is the Event of 2008 started. Since 2003, rents the Tweakers@ ~ clan, a large tent, which, during the lanparty offers place to 24 Tweakers. Last week worked hard to make the tent building and the network – literally – in the air to get.

The flags of Tweakers@the Event and CCTVSigns in the T@C-tent

Just like last year, the clan as ‘fieldadmin’ on field F; the first space that visitors encounter when they are in the field driving around. The beamerhoek of previous years, to make place for an lcd corner, and the kitchen made bigger by the gas stove and the refrigerators to divide into two marquees. Compared with the Event in 2007 has not changed, is that in addition to the tent, a tower, and a site container with a number of switches, and a coreswitch, which the network from the headquarters – on the Event also known as the NHQ called on the rest of the field is divided.

The glasfiberkabels be on the towers attachedto The fiber across the field of WallylanThe core and switches for the distribution of the network and internetButton power leads

The they of the Event, this year is a sort of big circus tent, which from the outside in each case, better and more compelling than the tent for earlier editions was used. In this huge tent is a place set aside for catering, a stage for the main sponsor and the required lcd televisions for the various consoles. Diagonally next to the they are the aggregates that Event provide the necessary power. These generators have a stock of a few thousands of litres of diesel.

The new theyThe they will be furnishedwith The new equipment of the cateringThe fiberkabels from the NHQ

The field that they, from Saturday, for the activities used. Like every year each tent to join in with the Camptentcup, which consists of a number of disciplines. Further, there may also gecasemod be, is the eye-handco lwa coordination with a spinning dart board to the test and at the end of next week, there is even a real cup-of-jut on the field.

The activitiesThe activities of the other side

Thursday afternoon were the t-shirts for the fieldadmins distributed. That shirts this year are red, while the Event crew in yellow shirts walking around. The activities team is to the green shirts to recognize. Everyone at the Event is present, will also get a shirt appropriate wristband to this year of textile and of plastic.

The fieldadminshirts of ~ 2008

Meanwhile, the official lwa le opening Event of 2008, behind the back, and since then, a large number of people a tent and a computer set up. The openingsnacht has quietly expired, and the T@C-tent gradually begins also full of touching. Thursday was perfect weather, allowing visitors on a dry field, their tents could drop. For Friday to see the predictions there are also good, but from Saturday there is rain expected – though it will this year, hopefully not as bad as last year…

Astute films stiff byA car on the groundsthe Tents on field FVisitors to build on